Summary of road construction activities

Construction of the Sirjan - Bandar Abbas highway with a length of 60 km (BOT)
Construction of 1200 km rural roads in Kerman and Sistan & Balouchestan provinces
Construction of Kharameh - Neyriz main road with a length of 40 km
Construction of Mahan - Bam - Zahedan road with a length of 300 km
Construction of Shahrebabak - Herat main road with a length of 50 km
Construction of Sirjan - Qatrouieh main road with a length of 50 km
Construction of bridges: the second Minab bridge, Bandar Abbas Resalat bridge, Halilroud third bridge in Jiroft, Shahid Hamedani bridge
in Hamadan and Abouzhar bridge in Kerman,
Hassan Langi bridge in Bandar Abbas, Iranshahr 800 meter bridge and Baft bridge with a span of 42 meter
Development and improvement of Jiroft, Bam, Kerman and Rafsanjan airports
Construction of Shahdad - Nehbandan road with a length of 120 km
Construction and improvement of a part of Masjed Soleyman - Godar Dam road
Construction of Rafsanjan - Sarcheshmeh - Khatunabad road’s second tunnel
Roadbed and substructure operation of the third part of Sirjan - Bardsir - Kerman railway (between km 90 and 110)
Bed consolidation and leveling of PDH-PP plan in Assalouyeh
Implementation of Gheshm Central Highway Project
Construction of the Second Lane of Sirjan - Ghatroiyeh Road
Construction of Kharameh – Neyriz Road
Construction of Kerman – Baft Road
Construction of the Second Lane of Bam – Zahedan - Shourgaz Road
Construction of the Second Lane of Bam – Zahedan - Nosratabad Road
Construction of the Second Lane of Zabol - Zahedan Road
Construction of the Great Bridge of Sarjaz – Jiroft
Implementation of Asphalt Improvement, Staining and Sealing of Kerman – Sirch – Shahdad – Nehbandan Road
Improvement, Widening and Asphalt Coating of Rural Roads in Rafsanjan
Construction of the Second Lane of Bam - Zahedan – Nosratabad Road (3rd part)
Construction of Edalat Pool
Excavation, embankment and terracing project of Pars Petrochemical Co. (Assalouyeh)
Completion of road paving project of the 3rd part of Khaf – Herat (Afghanistan)
Construction of side roads of Moharram Tunnel, Kazeroun – Kenartakhteh Road
Completion of Banekalaghi Road in Neyriz city
Construction of 8 wellheads and access roads of Yadavaran Oil Field
Construction of tunnel No. 3 of the 3rd part of Sirjan – Bardsir – Kerman Railroad
Construction of multi-level bypass in Anar city
Construction of section 4/A of the second lane of Zahedan-Bam highway with a length of 32 km
Completion of subgrade and asphalt paving of the Kerman-Dehuk route, with a length of 20 km
Construction of an access road to the Chengoleh oil field
Grade-separated intersection of Shahid Zangiabadi (Sharafabad)
Procurement of goods and construction of wellhead facilities in Khar Tang
Procurement, construction, and installation of fencing in the industrial zone of Bardsir region
Construction of the Zarand-Kouhbanan route

 

  • Construction of a bridge with a span of 20 to 40 meters over 8200 square meters
  • Construction of highways, main and secondary roads, rural roads and improvement of roads totaling more than 8500 km.
  • Currently, 1000 kilometers of roads are under construction by Jihad Nasr Kerman Holding

honors:

  • The record of building a 50-kilometer axis next to the western pass of Kerman in 100 days
  • A record of 4,500 tons of asphalt production and distribution per day in the West Belt Project of Kerman