Services of Jahad Nasr Kerman Company
Summary of road construction activities
- Construction of the Sirjan - Bandar Abbas highway with a length of 60 km (BOT)
- Construction of 1200 km rural roads in Kerman and Sistan & Balouchestan provinces
- Construction of Kharameh - Neyriz main road with a length of 40 km
- Construction of Mahan - Bam - Zahedan road with a length of 300 km
- Construction of Shahrebabak - Herat main road with a length of 50 km
- Construction of Sirjan - Qatrouieh main road with a length of 50 km
- Construction of bridges: the second Minab bridge, Bandar Abbas Resalat bridge, Halilroud third bridge in Jiroft, Shahid Hamedani bridge in Hamadan and Abouzhar bridge in Kerman
- Construction of Hasan Langi Bridge in Bandar Abbas - Construction of the large bridge of Sarjaz Jiroft, the 800-meter Iranshahr bridge and the Baft bridge with a span of 42 meters
- Development and improvement of Jiroft, Bam, Kerman and Rafsanjan airports
- Construction of Shahdad - Nehbandan road with a length of 120 km
- Construction and improvement of a part of Masjed Soleyman - Godar Dam road
- Construction of Rafsanjan - Sarcheshmeh - Khatunabad road’s second tunnel
- Roadbed and substructure operation of the third part of Sirjan - Bardsir - Kerman railway (between km 90 and 110)
- Bed consolidation and leveling of PDH-PP plan in Assalouyeh
- Construction of Qeshm Central Highway
- Construction of the second runway of the Sirjan-Qatroiye axis
- Construction of the second runway of the Sirjan-Qatrouye axis
- Construction of the Kerman-Baft axis
- Construction of the second runway of the Bam-Zahedan-Shurgaz axis
- Construction of the second runway of the Zahedan-Bam-Nusratabad axis
- Construction of the second runway of the Zabul-Zahedan axis
- Improvement, staining and asphalt coating of Kerman-Sirch-Shahdad-Nehbandan axis
- Improvement, widening and asphalt coating of rural roads in Rafsanjan
- Construction of the second runway of Bam-Zahedan-Nusrat Abad axis (section 3)
- Construction of a edalat pool
- Excavation, embankment and terracing project of Pars Petrochemical (Aslaviyeh)
- Completion of the pavement of the third section of Khaf-Herat railway (Afghanistan)
- Construction of roads on the sides of Moharram tunnel, Kazeroon-Kanartakhteh axis
- Completion of Baneh Kaloghi axis of Niriz city
- Construction of 8 sections of Sarcahi area and Yadavaran oil field access roads
- Construction of tunnel number 5, section 3 of the Sirjan-Bardsir-Kerman railway line
- Construction of multi-level bypass interchange in Anar city
- Construction of a bridge with a span of 20 to 40 meters over 7000 square meters
- Construction of highways, main and secondary roads, rural roads and improvement of roads totaling more than 8500 km.
- Currently, 1000 kilometers of roads are under construction by Jihad Nasr Kerman Holding
honors:
- The record of building a 50-kilometer axis next to the western pass of Kerman in 100 days
- A record of 4,500 tons of asphalt production and distribution per day in the West Belt Project of Kerman